Practice Engineering Economics — Quiz 4 on SonaPrep (Engineering Economics) with 10 scored questions. Use it to strengthen Engineering Economics skills with exam-style timing, clear scoring, and review after each attempt. Work carefully, check explanations for misses, then retake to track improvement before test day.
Questions
10
Category
Engineering Economics

Questions in this quiz (10)

  1. A construction firm has annual fixed costs of $$240000$$ and variable costs equal to $$60%$$ of sales revenue. The break-even sales revenue is most nearly:

    • $$450,365$$
    • $$523,325$$
    • $$600,000$$
    • $$785,350$$
  2. A company is evaluating whether to replace its existing equipment with a new automated system. The current equipment has fixed annual costs of $$80,000$$ and variable costs of $$50$$ per unit. The proposed equipment has fixed annual costs of $$140,000$$ and variable costs of $$35$$ per unit. At what production level will the total annual costs of both options be the same?

    • $$5285$$ units
    • $$2327$$ units
    • $$4000$$ units
    • $$3857$$ units
  3. A firm can either produce a component internally with fixed costs of $$120,000$$ per year and variable costs of $$18$$ per unit, or purchase it from a supplier at $$30$$ per unit. At what yearly production quantity would the company be indifferent between manufacturing and buying?

    • $$12,598$$ units
    • $$6667$$ units
    • $$10,000$$ units
    • $$8587$$ units
  4. A product has fixed costs of $$200,000$$, a selling price of $$100$$ per unit, and variable costs of $$60$$ per unit. If variable costs increase by $$10%$$ while all other factors remain unchanged, by approximately what percentage will the break-even quantity increase?

    • $$27.36%$$
    • $$19.25%$$
    • $$17.65%$$
    • $$15.56%$$
  5. A flood mitigation project has total benefits with a present worth of $$3,200,000$$. The initial construction cost is $$1,500,000$$, and annual operation and maintenance expenses are $$80,000$$ over a $$25$$-year period. Using an interest rate of $$6%$$ per year, what is the conventional benefit-cost ratio?

    • $$1.48$$
    • $$1.02$$
    • $$1.27$$
    • $$1.65$$
  6. A dam project has a present worth of benefits equal to $$5,000,000$$, environmental disbenefits with a present worth of $$800,000$$, and total costs with a present worth of $$3,500,000$$. Using the conventional benefit-cost ratio approach that includes disbenefits, what is the approximate $$B/C$$ ratio?

    • $$1.57$$
    • $$1.35$$
    • $$1.78$$
    • $$1.20$$
  7. A company is evaluating two investment alternatives. Alternative $$A$$ requires an investment of $$250000$$ and has potential revenues of $$520000$$ with probability $$0.65$$ or $$300000$$ with probability $$0.35$$. Alternative $$B$$ requires an investment of $$180000$$ and has potential revenues of $$410000$$ with probability $$0.55$$ or $$220000$$ with probability $$0.45$$. Based on expected profit, which alternative should be selected and what is its expected profit?

    • $$165500$$
    • $$193000$$
    • $$182600$$
    • $$165500$$
  8. A firm must choose between two products. Under high demand with probability $$0.45$$, Product $$X$$ yields $$450000$$ and Product $$Y$$ yields $$350000$$. Under low demand with probability $$0.55$$, Product $$X$$ yields $$180000$$ and Product $$Y$$ yields $$240000$$. The expected value of perfect information is most nearly:

    • $$45000$$
    • $$33000$$
    • $$55000$$
    • $$75000$$
  9. A project requires an initial investment of $$650000$$ and generates annual cash flows of $$150000$$ for $$8$$ years. Using a base discount rate of $$7\%$$, the NPV is $$122000$$. If a risk premium of $$3\%$$ is added to account for project uncertainty, the risk-adjusted NPV is most nearly:

    • $$52000$$
    • $$68000$$
    • $$150250$$
    • $$98000$$
  10. Equipment has the following annual cost scenarios: normal operation costs $$25000$$ with probability $$0.60$$, moderate failure requires $$70000$$ repair with probability $$0.25$$, and major failure requires $$140000$$ repair with probability $$0.15$$. The expected annual cost is most nearly:

    • $$39500$$
    • $$44500$$
    • $$49500$$
    • $$53500$$

Loading quiz...

Comments

Share your thoughts or ask a question. Comments are moderated before publication.

Loading comments…

Leave a comment